Example output

This page explains the deliverable pack format.
The following sections show the structure and content of each element you receive.

Deliverable 01

Marked-up drawings

Your drawing set returned with the relevant changes clearly annotated and numbered using sequential EVD markers. Colour-coded by risk level and cross-referenced to the change register.
A1 Addition Removal

Each drawing in the revision set is annotated to show where changes occur and what type of change applies.

  • Additions and removals clearly highlighted by colour
  • Callouts where detail affects scope
  • Suitable for site briefings and commercial review
  • Cross-referenced to the change register

Deliverable 02

Change register

A clear, organised record of the drawing changes identified during the comparison. Structured by area and drawing reference, with scope impact notes, the actions required and risk flags against each entry.
Change ID Sheet Ref Zone Element (GW-01) Change Type Report Summary Text Action Text Groundworks Impact Risk Flag Reason for Risk Flag Action Prompt Confidence Earlier Rev (if visible) Later rev (if visible)
EVD-001 920100 Site Entrance Drainage Route Added Drainage pipe runs and manholes have been added at the site entrance. Re-measure drainage and Manholes Yes HIGH Likely Scope Add Re-measure High P11 C03
EVD-002 920100 Building Drainage Route Extent Change The layout and route of the drainage in the building zone has changed. Review the Drainage and make an assessment Yes HIGH Likely Scope Change Review High P11 C03
EVD-003 920100 North East Drainage Route Added Drainage pipe runs and manholes have been added in the north east zone. Re-measure drainage and Manholes Yes HIGH Likely Scope Change Review High P11 C03
EVD-004 90001 North Services Route Added Additional services ducting has been added into the existing route in the north zone. Review ducting layout and number of services Yes HIGH Likely Scope Change Review High P03 C01
EVD-005 90001 North East Services Route Added Additional services ducting has been added into the existing route in the north east zone. Review ducting layout and number of services Yes HIGH Likely Scope Change Review High P03 C01
EVD-006 90001 East Services Route Added Additional services ducting has been added into the existing route in the east zone. Review ducting layout and number of services Yes HIGH Likely Scope Change Review High P03 C01
Deliverable 03

Change Intelligence Report

A concise narrative summary of the full comparison — covering key changes, risk overview and items requiring action. Written for commercial managers and project teams, not just site records.

Change Summary

A concise overview of all drawing changes identified in the comparison, grouped by area and package element.

Scope Risk Overview

A narrative assessment of the changes most likely to affect groundworks scope, programme or cost.

Commercial Considerations

Items the commercial team should act on — including potential compensation events, variation triggers and pricing implications.

Delivery Considerations

Changes that affect sequencing, methodology or site coordination — flagged for the project and site teams.

Queries & Assumptions

A list of items requiring confirmation from the design team or client before work proceeds or costs are committed.

BuildxChange provides structured identification and summary of visible drawing changes. Commercial valuation and pricing remain the responsibility of the contractor's commercial team.