Groundworks Dayworks Pricing System

£65.00

Build fully costed, defensible daywork rates — so your labour and plant costs are properly recovered

- +

Audience:

Groundworks and civil engineering contractors

Daywork rates are often challenged — especially when they’re not properly built up.

Rates get based on rough assumptions. On-costs are missed. Fuel and overheads aren’t fully accounted for.
When it comes to agreeing dayworks, there’s no clear breakdown to support the rate.

👉 And that usually means getting paid less than you should.

The Groundworks Dayworks Pricing System gives you a fully structured way to build accurate, defensible rates — so you can justify every number.

What it does:

Builds fully costed daywork rates for labour and plant, including fuel, on-costs, overheads, and profit. Updates automatically across all rates, producing a clean schedule ready for submission or reference

Who it is for:

  • QS’s and commercial managers preparing daywork submissions
  • Groundworks contractors needing defensible labour and plant rates
  • Teams currently using rough or inconsistent rate build-ups
  • Anyone wanting a structured, auditable pricing system

What’s included:

Instructions tab
Full user guide covering how to build and update rates

Assumptions tab
All inputs in one place including fuel, labour rates, plant rates, on-costs, overheads and profit — updates flow through automatically

Labour Build-Up tab
Detailed cost build-up across multiple labour roles including groundworkers, supervisors, engineers, and specialist trades

Plant Build-Up tab
Detailed build-up for operated and non-operated plant including excavators, dumpers, rollers, and other key items

Daywork Rates tab
Clean rate schedule with all rates automatically calculated and ready to submit or reference

Shopping Cart
Scroll to Top